Newlincs EfW facility
53°36′23″N 0°08′38″W / 53.6063°N 0.1439°W / 53.6063; -0.1439
[edit on Wikidata]
grid reference TA229138
The Newlincs EfW facility is an incinerator which is located in Grimsby, North East Lincolnshire, England. The plant is operated by Cyclerval UK & TIRU Group under a PFI contract. The engineering of the facility is unusual as it consists of an oscillating kiln handling 56,000 tonnes of waste per year/7 tonnes per hour of waste. The facility is capable of generating 3.2 MW electricity.[1]
See also
References
- ^ "Your waste, our energy" (PDF). Archived from the original (PDF) on 28 September 2007., www.newlincs.com, Retrieved 22 February 2007
External links
Wikimedia Commons has media related to Newlincs EfW facility.
- Newlincs
- Photo of facility
- v
- t
- e
Electricity generation in Yorkshire and the Humber
Biomass |
| ||||||
---|---|---|---|---|---|---|---|
Coal |
| ||||||
Gas |
| ||||||
Hydro |
| ||||||
Incinerators /waste |
| ||||||
Wind |
|
- Drax Group
- Pre-nationalisation electric power companies
- Yorkshire Electricity
This waste-related article is a stub. You can help Wikipedia by expanding it. |
- v
- t
- e