Andal–Sitarampur loop line

Railway line in West Bengal

  • Andal
  • Sitarampur Junction
Stations10ServiceTypeElectricSystemBroad gaugeOperator(s)Eastern RailwayHistoryOpened1864TechnicalLine length41 km (25 mi)Track gauge5 ft 6 in (1,676 mm) broad gaugeElectrificationYesOperating speedup to 100 km/h (62 mph)
Route map

Legend
km
Up arrow
Andal Marshalling Yard
0
Andal
LowerRight arrow
NH19-IN.svg NH 19
Down arrow
8
Sonachara
Parasea Colliery
Bahula Colliery
Chora Colliery
Banshra Siding
Kunustoria Colliery
Belbaid Colliery
12
Tapasi
Super Smelters Ltd Sidings
Sripur Colliery
Adjoy II Colliery
Bhanora Colliery
15
Ikra Junction
20
Jamuria
former Ikrah–Churulia–
Rupnarayanpur line
(dismantled)
Barabani–Churulia line
(planned)
27
Barabani
33
Chinchuria
UpperRight arrow
41
Sitarampur
Right arrow
Down arrow
Churulia
Gaurangdi
dismantled connection
to Gaurangdi
53
Rupnarayanpur
Down arrow
km

The Andal–Sitarampur loop line is a railway line connecting Andal & Sitarampur on the Bardhaman–Asansol section of the Howrah–Delhi main line with each other. This 41 kilometres (25 mi) track is under the jurisdiction of Eastern Railway. This track primarily serves the northern coalfield areas of the Paschim Bardhaman district in the Indian state of West Bengal.

History

The Ondal-Baboissola Railway was constructed by the Tarkessur Railway Company in 1863 and was opened to traffic on 1864. The lines were worked upon by East Indian Railway Company till 1914 before the Tarkessur Railway Company was acquired by the State in 1915 & incorporated with EIR following which this line became a part of the EIR network. The original line opened from Andal (Ondal) to Tapasi via Baboissola (Babuisol, near Andal) & Mangalpur on 1863. This was further extended to Rupnarayanpur on the Howrah–Delhi main line via Ikrah, Churulia & Gaurangdi on 1894–95.[1]

The Ikrah-Barabani branch line opened on 1894. This further extended to Sitarampur on the Bardhaman–Asansol section in 1902.[1]

The Tapasi-Barabani Chord line was completed between 1908–15 to serve the numerous collieries in the area.[1]

Post independence, the Ikrah-Churulia-Gaurangdi-Rupnarayanpur section suffered heavy losses due to which services were withdrawn by Eastern Railway in 1988. The line was scrapped by iron mafias and a mine was setup by dismantling the tracks in 1995.

Branch lines

There are two branch lines in this section. The first is the Tapasi-Barabani Chord section. This primarily serves the coalfields of the Sripur Area & Satgram Area and is used by freight trains, The other is the Ikrah-Churulia-Gaurangdi-Rupnarayanpur section. This track was dismantled. A new line was proposed in the railway budget of 2011 between Barabani & Churulia.[2]

Electrification

Electrification of the Andal-Barabani-Sitarampur section was sanctioned in the rail budget for 2011–12, and was completed in 2017.[3][4]

References

  1. ^ a b c "Administration Report on Railways 1918 page 54". Retrieved 23 September 2021.
  2. ^ "Speech of Mamata Banerjee introducing the Railway Budget 2011-12 25th February 2011" (PDF). Archived (PDF) from the original on 9 July 2020. Retrieved 23 September 2021.
  3. ^ "Electrification of new rail sections". Press Information Bureau. Retrieved 28 November 2011.
  4. ^ "CAG Report on Railways pg 22" (PDF). Retrieved 23 September 2021.

|

  • v
  • t
  • e
Railways in Eastern India
National network/
trunk linesOther lines/sections
Interstate
Bihar
Jharkhand
Odisha
West Bengal
Suburban
rail transportMonorailDefunct lines
Revived/
Under revival
Inactive
Zones & Divisions
Eastern
East Central
East Coast
North Eastern
Northeast Frontier
South Eastern
Production units/
workshopsTransit points
with Bangladesh
Active
Defunct
Indian railheads
near India–Nepal borderRailway companiesSee also